Saw the space for the first time, it's beautiful, gonna have to raise more capital
Finally signed the final lease, this is our new home and we have options out to 15 years.
Selected the architect and met for a walk through of the empty space.
A pink surprise, after doing preliminary scrubbing of the floor it was revealed that we have pink floors.
Our tables are going to be tops! We start building the table tops for the tasting room barrels.
Plans finally approved by the City of Allentown and 3rd party engineers.
Testing window glass for Witch House façade.
Contractors selected (except HVAC)
Application submitted to the TTB and construction begins
Construction begins, the landlord was nice enough to cut the floors for sewer lines and excavate down to the tie in line.
Building the Witch House sign replica
Plumbing work begins, the sewer lines are connected and back filled with stone.
Trench drains are set and ready for concrete, electrical panels mounted and ready for tie in. Mom finishes the stained glass windows.
All three Witch House signs and the bars are completed.
Concrete poured to fill the floor cuts for sewer and trench drains.
Witch House front door replica, table tops and supports completed.
Power lines run out to the hand off point for PPL at considerable cost!
Our new mailbox and walls!
We are officially a licensed distillery!
Dust storm, we rented equipment to prep the floor for epoxy only to find out that the pink stuff wasn't concrete sealer but epoxy and HVAC contractor selected (finally)
Distillery floors epoxied
Time to paint some walls
Finally some privacy from the neighbors, the noise maker (air compressor) is removed and the demising wall is completed.
Final configuration taking shape.
We have POWER.
Paint and putting things in place.
The beast takes a ride to the roof.
Base cabinets and windows in place on the Witch House wall, ceiling grid completed.
Concrete countertops are finally in place, with the help of almost 20 friends to lift and place these monsters.
Testing the industrial lighting swags for bulbs and placement, Witch House sign finds it's home, distillery cleansed of all the dirt and dust left by the contractors.
Flooring the tasting room begins,
Witch House façade finally done! So tired of concrete boards making dust and destroying saws, blades, etc.
Family artist Lars starts laying out the lineage mural.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.
Inspectors show up for Final Inspection, create punchlist for CO approval.